Project background
B
Equipment customization
C
Process design and factory design
D
Both parties further confirm the drawings
E
Equipment production and manufacturing
F
Equipment steel frame foundation and wheat conditioning bins construction
G
Inspection and testing before shipment
H
Packing and shipping
I
Installation team
J
After-sales service
April. 04, 2024
February. 02, 2024
January. 01, 2024
The 260TPD maize production line was installed in January 2024
January. 01, 2024